Chapter 1 Introduction

Unit test(Chapter 1)

1、中国作业(Single Choice) Which of the following countries did not participate in the promotion of the first construction climax of high-speed railway.( )
A、大学答案答案Japan
B、课后课后France
C、中国作业France
D、大学答案答案Germany

2、课后课后(Single Choice)Which of the following is 中国作业not the technical and economic characteristics of high-speed railway.( )
A、Easy construction
B、大学答案答案High safety
C、课后课后Fast speed
D、中国作业High conveying capacity

3、大学答案答案(Single Choice)Which of the following is 课后课后not the subsystem of high-speed railway system.( )
A、The中国作业 public works engineering subsystem
B、The大学答案答案 EMU subsystem
C、The课后课后 information subsystem
D、The operation control subsystem

4、(Multiple Choice)Which of the following are the 10 world records created by China's high-speed railway.( )
A、The fastest construction speed
B、The highest speed of wheel-rail test
C、The highest operating speed
D、The longest operating mileage

Chapter 2 HSR Construction Project Management

Unit test(Chapter 2)

1、(Single Choice)The task of project management of high-speed railway can be summarized as which three objectives of the project are best achieved.( )
A、Quality, Duration and Safety
B、Safety, Duration and Benefit
C、Quality, Safety and Benefit
D、Quality, Duration and Cost

2、(Single Choice)In the project management of railway construction, which of the following is the mode of contracting according to the quantity of project.( )
A、The lump-sum contracting mode
B、The construction management mode
C、The general project contracting mode
D、The unit price contracting mode

3、(Single Choice)In the process of high-speed railway construction, which stage does the project benefit evaluation be done?( )
A、The pre-feasibility study stage
B、The feasibility study stage
C、The design stage
D、The completion acceptance stage

4、(Multiple Choice)What stages are included in China's railway construction process.( )
A、The project approval and decision stage
B、The design stage
C、The project implementation stage
D、The completion acceptance stage

Chapter 3 Feasibility Study on HSR Construction Projects

Unit test(Chapter 3)

1、(Single Choice)The characteristics of feasibility study do not include which of the following.( )
A、Predictability
B、Comprehensiveness
C、Uncertainty
D、Property of prophase

2、(Single Choice)The work of feasibility study stage of China's high-speed railway project does not include which of the following.( )
A、Project evaluation and decision
B、Feasibility study
C、Compilation of project proposal
D、Design of construction drawing

3、(Single Choice)Which of the following is not the differences between financial evaluation and national economic evaluation in the economic evaluation of high-speed railway construction project.( )
A、Different evaluation angle
B、Different price system and main-parameter
C、Different time of evaluation
D、Different range of cash flow

4、(Multiple Choice)Which of the following belong to the cost of high-speed railway construction project.( )
A、Non-operating expense
B、Interest of construction period
C、Operating expense
D、Tax and surcharge

Chapter 4 Survey, Investigation and Design of HSR Projects

Unit test(Chapter 4)

1、(Single Choice)<Management measures for survey and design of Railway Construction Engineering> stipulates the requirements for the preparation of railway construction engineering design documents. Which of the following options is not required by the method( ):
A、Design contract
B、Project approval documents
C、Project feasibility study report
D、Main technical policies of Railway

2、(Single Choice) Which of the following options is the contents of high-speed railway engineering survey and design?( )
A、Preliminary design and construction design
B、Preliminary design, technical design and construction design
C、Preliminary design, technical design
D、Technical design and construction design

3、(Multiple Choice) The railway network planning and comprehensive transportation planning, the railway construction engineering design must base on the railway network planning and comprehensive transportation planning, and adopt advanced transportation management mode. What factors should be considered comprehensively?( )
A、Transportation capacity of road network
B、Transport quality
C、Technical conditions of relevant lines
D、Operation cost and project investment

4、(Multiple Choice)Which of the following options are new topics of high-speed railway survey and design( )
A、Sustainable development concept
B、Accuracy and depth requirements
C、Cost control
D、Speed requirements

Chapter 5 HSR Construction

Unit test(Chapter 5)

1、(Single Choice) Which of the following options is the main responsibility of the general contractor?
A、Supervision work
B、Be fully responsible for the organization and management of project construction
C、Consulting work
D、Construction operation

2、(Single Choice) In the early stage of railway construction, according to the approved project proposal, what work shall be organized and completed by the head office or the construction unit?
A、Preliminary design and construction drawing design
B、Preliminary survey and feasibility study report
C、Completion report
D、Feasibility study report and preliminary design

3、(Multiple Choice) What are the main characteristics of the project legal person responsibility system?
A、Economic entity
B、Provisional institutions
C、No responsibility after completion
D、Contract as a link

4、(Multiple Choice) What are the pre-approval documents before the approval of the feasibility study report?
A、Planned location
B、Environmental assessment
C、Soil and water conservation
D、Social stability risk assessment

Chapter 6 HSR Construction Organization Plan

Unit test(Chapter 6)

1、(Single Choice) Network planning optimization does not include( )?
A、Resource optimization
B、Duration optimization
C、Environmental optimization
D、Cost optimization

2、(Single Choice) What are the contents of practical construction organization design :( )?
A、Select construction partners
B、Determining the construction period of main nodes
C、Calculating the engineering quantity according to the design documents or drawing data, etc
D、Dividing the construction sections and formulate the overall construction schedule

3、(Multiple Choice)The ( ) of the railway construction organization design shall be prepared by the designer in the design stage?
A、Guiding construction organization design
B、Implementation construction organization design
C、General construction organization plan
D、Comments on construction organization plan

4、(Multiple Choice) When optimizing the resource demand plan, if the adjustment of non critical work still fails to meet the requirements, the following measures can be taken:
A、Modifying the logical relationship between engineering activities
B、Changing construction scheme
C、Compressing resource input of key lines
D、Rearranging the construction sequence

Chapter 7 Construction Progress Management of HSR Projects

Unit test(Chapter 7)

1、(Single choice)The construction progress analysis method does not include:
A、Gantt chart comparison
B、List comparison
C、Actual progress forward line comparison
D、Graphic comparison

2、(Single choice)The advantages of engineering construction management software do not include:
A、Collect engineering data in real time
B、Facilitate progress risk control
C、Real-time display unit engineering data information
D、It is convenient for managers to adjust and manage the construction schedule in a targeted manner

3、(Multiple choice)Which of the following is the part of the procedure for preparing the construction schedule of the project?
A、Sorting of project activities
B、Formulate the project schedule
C、Project quality management
D、Project description and project breakdown

4、(Multiple choice)The construction progress control measures mainly include:
A、Propose measures to adjust progress
B、Review of adjustment measures and new plans
C、Review and approve the implementation plan and schedule of the project
D、Assess the Impact of deviation on project objectives

Chapter 8 Cost Control and Management of HSR Projects

Unit test(Chapter 8)

1、(Single choice)(2 points)Regarding the budget preparation, what is done during the feasibility study phase is ( )
A、Construction drawing budget
B、Project settlement
C、Investment estimate
D、Design estimates

2、(Single choice)(2 points)Project static investment does not include ( )
A、Construction cost
B、Equipment installation fee
C、Basic reserve fee
D、Installation engineering cost

3、(Multiple choice)(3 points)The unit project is composed of many branch projects with internal connections. It is possible to decompose a unit project into several branch projects according to ( ).
A、Materials used
B、Equipment type
C、Project cost
D、Engineering parts

4、(Multiple choice)(3 points)In order to ensure the scientific nature of project cost control at the decision-making stage, decision makers should do the following ( ):
A、Strengthen research on social impact
B、Deepen the feasibility study depth
C、Establish a database of railway construction cost
D、Improve the quality of investment estimates

Chapter 9 Quality Control and Management of HSR Projects

Unit test(Chapter 9)

1、(Single choice)(2 points)Which of the following special products belong to the scope of engineering quality?
A、Construction engineering product entities and services
B、Construction engineering product cost
C、Life of construction engineering products
D、Strength of construction engineering products

2、(Single choice)(2 points)The formation of high-speed railway projects generally includes the following five processes, namely the survey process, design process, (), construction process and use process.
A、Auxiliary production process
B、Preparation process
C、Inspection process
D、Measurement process

3、(Multiple choice)(3 points)Quality management has generally experienced three stages: ( )
A、Quality inspection managemt
B、Statistical quality management
C、Multiple quality management
D、Total quality management

4、(Multiple choice)(3 points)Which of the following product quality characteristics can be directly qualitative and quantitative?
A、Strength
B、Thickness
C、Comfortable
D、Height

Chapter 10 Contract Management and Risk Management of HSR Projects

Unit test(Chapter 10)

1、( ) is the core of project managementQuality management.
A、Cost management
B、Contract management
C、Quality management
D、Schedule management

2、According to ( ) classification, the project contract can be generally divided into total price contract, unit price contract and cost plus remuneration contract.
A、Job content
B、Contract scope
C、Project deadline
D、Payment method

3、(Multiple choice)Risk is a possible event that affects the realization of a project. The basic elements include:
A、Uncertainty of consequences
B、Uncertainty of occurrence probability
C、Existence of risk factors
D、The uncertainty that occurrence

4、The "red book" compiled and published by FIDIC do not means ( )
A、"Contract Conditions for Electrical and Mechanical Engineering"
B、"Construction Contract Conditions of Civil Engineering"
C、"Design-Build and Turnkey Engineering Contract Conditions"
D、"Civil Engineering Construction Subcontract Conditions"

Chapter 11 Supervision and Control of HSR Projects

Unit test(Chapter 11)

1、What is the most important difference between Type I change design and Type II change design?
A、Changes can only be implemented after review and approval
B、Notify parties of design changes
C、Issuing changed construction drawings
D、Financial approval

2、Which is not included in the general content of supervision work?
A、Set up project supervision organization and prepare supervision plan
B、Preparation of implementation rules for supervision
C、The specific implementation of the supervision work before the project starts
D、Participate in project bidding

3、(Multiple choice)In the design stage, the supervisor should conduct design tracking and cooperate with the design progress review. What are the contents of the review?
A、Scheme comparison and demonstration
B、Standardization of design documents
C、Valuation and investment
D、Design progress

4、(Multiple choice)As a new management model, the Sino-Foreign Supervision Consortium reflects the problems to be improved?
A、The principle of Chinese and foreign technology is different
B、Language barrier
C、Both sides are alert
D、Management system issues

Chapter 12 Inspection on Completion and Post-evaluation of HSR Construction Projects

Unit test(Chapter 12)

1、Not included in the basic procedures for post-evaluation of high-speed railway construction projects?
A、Instructed by superior competent department
B、Collect data and select data, analyze and process collected data
C、Organize post-project evaluation agencies and select targets for post-project evaluation
D、Evaluation, preparation and post-evaluation report

2、Not included in the main purpose of post-evaluation of high-speed railway construction projects?
A、Investigate whether the project has realized the expected benefits of the project before construction. At the same time, summarize the experience and lessons generated in the construction of the project, and summarize the necessary support information
B、Find the mistakes of all parties in the project implementation process and summarize this record to prepare for the high final price and lawsuit in the future
C、Provide reference and support for decision-making, construction and management of future high-speed railway engineering projects, avoid problems and errors, and improve the effectiveness of future projects
D、Analyze and summarize the entire process of project construction to determine whether the project has achieved the actual results expected before construction

3、(Multiple choice)What are the stages involved in the completion and acceptance of high-speed railway construction projects?
A、Static and dynamic acceptance
B、Security assessment
C、Settlement
D、Preliminary and formal acceptance

4、(Multiple choice)What are the characteristics of post-evaluation compared with pre-evaluation of high-speed railway construction projects?
A、Feedback
B、Exploratory
C、Comprehensiveness
D、Engineering economic predictability

Chapter 13 Case Study of China's HSR Construction Management

Course work for Chapter 13 Case Study of China's HSR Construction Management

1、What is the significance of the construction of Beijing-shanghai high-speed railway?

2、What does the standard management of Beijing-shanghai high-speed railway construction include?

3、What are the six-in-one management objectives of the Beijing-shanghai high-speed railway?

4、What are the types of measuring points in the observation section?

5、What are the construction steps of ballastless track?